Skip to main content

About your Search

20110701
20110731
Search Results 0 to 15 of about 16 (some duplicates have been removed)
against those in your district. >> we definitely have a few big projects for issues -- or issues we're paying a lot of attention to and we will continue to devote a lot of attention to, both myself and my staff. one of biggest ones is the planned development of the new campus for california and pacific medical center. that has dominated a lot of city-wide dialogue in the past few years. that project is slated to go forward or get through the entitlement process this year in city hall. if you are not familiar, we currently have a california campus and a pacific campus, and the plan is to build a bigger campus and consolidate those services into one larger hospital at the old cathedral hill spa on van ness, and that is going to have a huge impact, both in terms of the neighborhood in district 2, not only the new campus, but what happens to the pacific and california campus. also, is a huge job creator. we're making sure to do it in a way to we have every constituent buy into the project, create a ton of new jobs, and move forward with a health care system that benefits all of us. othe
so that they are stable and do not drain the general fund. that is a big aspect of it. another huge issue is the deferred maintenance on our infrastructure. we have a lot of infrastructure that has been deteriorating because we have not maintained properly. that includes roads, sewer systems, muni. we need to be much more diligent about maintaining our infrastructure. some of the big citywide issues that impact the district include transportation. we had more muni service and some other districts. it is not always reliable. some of the major bus lines in the district are not reliable. we have major projects like the renovation of delores park. it is an opportunity to define what the park is and what changes we want to make to it. that is going to be and port project, the same thing with glen canyon that is going to undergo a lot of work. one of the most challenging parts of the new district supervisor is that we elect the supervisors by district. it is very important to pay attention to the district, be engaged in the projects in the district. we also represent the whole city. any d
them and then do what's necessary to rehabilitate or repair, you're going to have a big problem. and they're going to collapse. they're going to fail. and all of a sudden, the water, or the sewage that normally goes through them, will not have any place to go. it'll back up into homes, it'll back up onto the street. it's normally out of sight, out of mind. once it comes to the surface, it's a whole 'nother animal. melosi: you're talking about system-wide problems that would take tremendous human resources to correct. this is true with drinking water, as well as wastewater. man: first, our top story. thousands of people are without water tonight. woman: a flash flood of the manmade kind. apparently, a 12-inch pipe burst. take a look behind me. this water main break shut off water to 2,200 residents. woman: how many breaks are you working on right now? we have 24 breaks working right now. man: in our company, washington suburban sanitary commission, we had 479 water main breaks in february -- the most ever, for any february. man: this 10-inch water main in willard park is 73 years
Search Results 0 to 15 of about 16 (some duplicates have been removed)